Facebook Twitter Pinterest linkedin Telegram
dog
lookbook
Manimal
Login / Register
0 Wishlist
0 items / 0Ft
Menu
Manimal
0 items / 0Ft
  • NEW IN
  • SLEEP
    • SLEEP
      • Bed
      • Blanket
  • EAT
    • EAT
      • Bowl
  • WALK
    • WALK
      • Collar
      • Harness
      • Leash
  • TRAVEL
    • TRAVEL
      • Bag
      • Travel Bed
  • PLAY
    • PLAY
      • Toy
      • Sanck Bag
  • WEAR
    • WEAR
      • Coat
      • Rain Coat
      • Sweater
      • Bandana
  • GROOM
    • GROOM
      • Care
      • Health
  • ACCESSORIES
    • ACCESSORIES
      • Gift Card
      • Poop Bag
      • Sanck Bag
  • SALE
Click to enlarge
HomeDOGWALKLeash Bergamo Long Braided Lead
Previous product
Bergamo City Lead 34.650Ft
Back to products
Next product
Bergamo Long Lead 41.650Ft
MiaCara

Bergamo Long Braided Lead

55.650Ft

Durable leather lead with braided details

Clear
Add to wishlist
SKU: N/A Categories: DOG, Leash, WALK
Share
Facebook Twitter Pinterest linkedin Telegram
  • Description
  • Additional information
  • Shipping
  • size chart
Description

The sturdy and stylish Bergamo long lead is the perfect choice for dog owners who are looking for a design piece that can stand up to plenty of wear and tear. Created for everyday use, the Bergamo long lead is made from a combination of hand-braided double-face leather and smooth leather.

The strong leather is perfect for active dogs that love outdoor adventures in any weather conditions. These all-weather leads are complemented by stainless steel D-rings and a satin plated full-brass hook.

Mix and match: Why should your dog always wear the same set? Bergamo gives your four-legged friend a variety of looks with three different leads. Choose between a braided city lead and two long leads, one completely smooth and the other one combined with braided leather, depending on your personal style.

The Bergamo long lead can also be combined with the Lucca collars, as both are made from the same leather.

 

Braided leather: Hand-braided cowhide leather, vegetabletanned and waxed.
Leather: Cowhide leather, vegetable-tanned and waxed.
Hardware: D-ring: matte, brushed stainless steel.
Snap hook: satin plated brass, nickel-free.

Care instructions:
Leather is a natural product with individual character and variations. The natural
features are an indication of the authenticity of the leather and have no inuence on
its life or quality. Slight deviations with regard to surface texture and color are normal.
The metal hardware used for our dog collars and leads is solid surface coated.
Mechanical friction between the D-ring and snap hook over time may result in some
signs of wear on the surface. This is normal and does not constitute a reason for
complaint.
To remove dirt and stains, use a soft damp cloth. Please avoid excessive rubbing.
In order to maintain the good condition of your MiaCara product as long as possible,
please pay attention to proper care. In particular dog collars are especially strained by
everyday use. Therefore, please consider the following care instructions: Please
grease the leather parts from time to time. For that we recommend Tapir leather fat
(www.tapir.de). Please take note of the manufacturer’s instructions for use. Depending
on use, you should repeat this at regular intervals. This way the leather will stay
supple and durable.

Additional information
Brand

MiaCara

Color

Leather: Brown

Shipping
Your order is usually dispatched within 2 - 5 working days after receipt, provided that no other information is stored on the product page and the item is available. If there are products in the inflow, this is also shown in the product description. Here the delivery time amounts to max. 5 - 12 working days. If a product is sold out or delayed, we will inform you by email.
size chart
The Bergamo dog lead is available in one size. ca. 195 x 2 cm (L x W), 3-times adjustable

Related products

Select options
Quick view
Add to wishlist
Close

Stella Box Dog Bed

MiaCara
80.150Ft – 139.650Ft
Select options
Quick view
Add to wishlist
Close

Feltro Dog Cushion

MiaCara
48.650Ft – 83.650Ft
-33%Sold out
Select options
Quick view
Add to wishlist
Close

Luna Dog Sofa

MiaCara
69.650Ft – 174.650Ft
-22%
Select options
Quick view
Add to wishlist
Close

Letto dayBed

MiaCara
314.650Ft 244.650Ft
Select options
Quick view
Add to wishlist
Close

Felpa Dog Cushion

MiaCara
52.150Ft – 87.150Ft
Select options
Quick view
Add to wishlist
Close

Sonno Box Dog Bed

MiaCara
80.150Ft – 139.650Ft
Select options
Quick view
Add to wishlist
Close

Lucca Long Lead

34.650Ft
Select options
Quick view
Add to wishlist
Close

Bergamo City Lead

MiaCara
34.650Ft

Manimal. Premium for Pets.

Budapest
Mobil: +36702379245
Email: hello@manimal.hu
MY MANIMAL
  • My Account
  • My Orders
  • My Wishlist
CUSTOMER SERVICE
  • Shipping & Payments
  • Return
  • General Terms of Contract
  • Cookies
  • Privacy Statement
  • Impressum
ABOUT MANIMAL
  • About us
  • Contact Us
  • Lookbooks
  • Blog
© 2020 Manimal. All rights reserved
payments payments payments
Shop
0 Wishlist
Dog

Shopping cart

close
close
Start typing to see products you are looking for.
  • NEW IN
  • SLEEP
  • EAT
  • WALK
  • TRAVEL
  • PLAY
  • WEAR
  • GROOM
  • ACCESSORIES
  • SALE
  • Wishlist
  • Login / Register
Scroll To Top